Construction documentation includes preparing the complete set of drawings, specifications, and supporting documents a team uses to bid and build a project. The core documents include construction drawings, specifications, schedules, and bid packages, developed across four stages: design development, construction documents, bid set, and as-built.
These documents matter because they are the single source of truth that every trade, bidder, and inspector works from. When that source is incomplete or disconnected across disciplines, the result shows up directly in the numbers: poor or disconnected documentation drives about 52% of rework and cost US firms roughly $31.3 billion in 2018 (FMI / PlanGrid). Complete, coordinated construction documentation cuts rework, disputes, and cost overruns before they start.
Construction documentation covers several document types, each with a specific role and we are experienced in all.